Details: earth work in excavation in foundation trenches in hard soil(vide classification of soil item-b) and disposal of excaveted earth as obtained to a distance upto 50m including all lifts levelling, ramming the foundation trenches, removing roots of trees,shrubs all complete as per approved design,building specification and direction of e/i. by mix in place method (construction of granular sub- base by providing close graded material spreding in uniform layers with motor graded in prepared surface , mixing by mix in place method with rotavator at omc , compacting with vibratory roller to achieve the desired density , complete as per clause 401). plain cement concrete in open foundation complete as per drawing and technical specification. (a) pcc grade m20(1:1.5:3), providing and laying stone dust filling in flank subbase-do-all complete all as per direction of engineer-in-charge. providing and laying factory made chamfered edge cement concrete paver blocks in footpath, parks, lawns, drive
Sector: Zilla Parishad