Details: clearing grass and removal of up to a distance of 30 m outside the periphery of the area as per technical specification clause 201 scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres. dismantling of flexible pavements (dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately)bituminous courses by mechanical means compacting original ground supporting subgrade (loosening of the ground upto a level of500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.) construction of subgrade and earthen shoulders (construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required and compacted to meet requirement of ta
Sector: RDPR