Details: jungle clearance in borrow area, building premises, flanks and slopes on the roads, canals and embankment by removing the grass and the jungle bushes from the top including weeding out shrubs including roots and levelling etc. complete as per direction of e/i. (specification revised in the meetting of regional co-ordinators held on 11.01.84 in the office of t.e.c.)wrd sor 5.1.3.1, part b) part- a 2.3(ii). e/w in excavation of foundation trenches as per designed section in all kinds of soil including moorum soil, soil mixed with kankar, pebbles and boulders upto 300 mm size and disposal of the same (beyond 50m away from the toe of the dam in country side) within initial lead of 150m and initial lift of 1.5m. all lifts as per specification and direction of e/i.item no.(5.1.8) providing and laying p.c.c or r.c.c. m150 with nominal mix of (1:2:4) in various components of dam foundation with approved quality of 20mm graded coarse aggregate of required grade as per design and approv
Sector: Water Resource Department