Details: section i building work earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item -a) and disposal of excavated earth as obtained to a distance upto 50 m including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of e/i. extra for earthwork in hard soil as per specification and direction of e/i. ( vide classification of soil item-b) earth filling in foundation trenches and plinth in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation foundation trenches within a lead of 50 m and lift of 1.5 m all complete as per building specif
Sector: Police and Internal Security