Details: bridge part earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approvedmaterial. ordinary soil depth upto 3m depth between 3m to 6m excavation for structures in ordinary rock not requiring blasting (earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approvedmaterial) mechanical means back filling behind abutment, wing wall and return wall complete as per drawing and technicalspecification pcc 1:3:6 in foundation (plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foudation and compacted by vibration includi
Sector: RDPR