Details: earth work in excavation in foundation trenches in ordinary soil (vide classification of soil, item:a) and disposal of excavated earth as obtain to a distance upto 50m including all leads, levelling ramming the foundation trenches removing roots of trees, shurbs all complete as per appeoved design, building specification and direction of e/i.( 5.1.1/bcd) providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of e/i. (mode of measurment compacted volume). (5.1.10/bcd) supplying and laying(properly as per design and drawing) rip-rap with good quality boulders duly packed including the cost of materials,royality all taxes etc,but excluding the cost of carriage all complete as per specification and direction of e/i.(5.6.8/wrd) plain/reinforced cement concrete in op
Sector: Zilla Parishad