The JKPWD has published a tender for "Road Safety Measures / Rectification of Blackspots on Chapnari Guddar Road in Km 2nd RD 300-500 and Km 3rd RD 800-1000 under Road Safety measures 2025-26." on the 05 Dec 2025. This tender belongs to Road Signage Work category. This tender is published in Ramban, Jammu and Kashmir location. The vendors interested in this tender and related Road Signage Work tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: signage Tenders | road traffic sign boards Tenders | road Tenders
Related categories: Antenna Repair Tenders | Artificial Turf Installation Tenders | Wire Fencing Tenders |
Jammu and Kashmir has published 12 tenders in Road Signage Work in the last financial year.
Out of these, 1 were published last month.
| Tender Title | Road Safety Measures / Rectification of Blackspots on Chapnari Guddar Road in Km 2nd RD 300-500 and Km 3rd RD 800-1000 under Road Safety measures 2025-26. |
|---|---|
| Tender Description | earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: all kinds of soil providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) providing and erecting a "w" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 |
| Comments | earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: all kinds of soil providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) providing and erecting a "w" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 |
| Published Date | |
|---|---|
| Due Date | 07 Dec 2025 00:00:00 |
| Estimated Value | 4.0 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |