The JKRDPR has published a tender for "UPGRADATION OF TRACTOR PMGSY ROAD FROM LOHARA MOHALLA TO CHAK PARTARA NHO PREMDAS W NO 02 pyt chak rakhwalan Block udhampur under BDC capex for the yeaer 2025-26" on the 01 Nov 2025. This tender belongs to Road Construction category. This tender is published in Udhampur, Jammu and Kashmir location. The vendors interested in this tender and related Road Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: road Tenders | road and drain Tenders | all civil works Tenders
Related categories: Road Construction Tenders | Bus Bay Tenders | Road related beautification Tenders |
JKRDPR issued 8,335 tenders for Road Construction last year
With, 1 floated just last month.
| Tender Title | UPGRADATION OF TRACTOR PMGSY ROAD FROM LOHARA MOHALLA TO CHAK PARTARA NHO PREMDAS W NO 02 pyt chak rakhwalan Block udhampur under BDC capex for the yeaer 2025-26 |
|---|---|
| Tender Description | earh work in excavation by manual means in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.a.k.s p/laying dry stone agg using 40 mm n/s agg earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 min width as well as10 sqm on plan including disposal of excavated earth,leadupto50meterand lift upto 1.5m, as directed by engineer-in-charge.all kinds of soil : add cost of hume pipes p/laying c.stone conc 1:3:6mix using 20 mm n/s agg and curing complete with 70% qty. in conc. p/laying c.stone conc 1:3:6mix using 20 mm n/s agg and curing complete with 30% qty. in boulders providing and laying random rubble stone masonry laid dry using n/stones centring and shuttering including strutting propping etc and removal of form work carriage of bajri 25km by mt carriage of sand 85km by mt carriage of stones 800m by mt add cost of di |
| Comments | earh work in excavation by manual means in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.a.k.s p/laying dry stone agg using 40 mm n/s agg earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 min width as well as10 sqm on plan including disposal of excavated earth,leadupto50meterand lift upto 1.5m, as directed by engineer-in-charge.all kinds of soil : add cost of hume pipes p/laying c.stone conc 1:3:6mix using 20 mm n/s agg and curing complete with 70% qty. in conc. p/laying c.stone conc 1:3:6mix using 20 mm n/s agg and curing complete with 30% qty. in boulders providing and laying random rubble stone masonry laid dry using n/stones centring and shuttering including strutting propping etc and removal of form work carriage of bajri 25km by mt carriage of sand 85km by mt carriage of stones 800m by mt add cost of di |
| Published Date | |
|---|---|
| Due Date | 10 Nov 2025 00:00:00 |
| Estimated Value | 1.46 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |