The JK Forest has published a tender for "CONSTRUCTION OF BO. HUT JOINT CONTROL ROOM AT JUNGLE GALI IN KATRA RANGE , FOREST DIVISION REASI UNDER UT CAPEX 2025-26" on the 11 Sep 2025. This tender belongs to Cottage Construction category. This tender is published in Reasi, Jammu and Kashmir location. The vendors interested in this tender and related Cottage Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: residential building Tenders | all civil works Tenders | residential building construction Tenders
Related categories: Prefabricated Wooden House Tenders | Cottage Repair Tenders |
Jammu and Kashmir has published 302 tenders in Cottage Construction in the last financial year.
Out of these, 5 were published last month.
Tender Title | CONSTRUCTION OF BO. HUT JOINT CONTROL ROOM AT JUNGLE GALI IN KATRA RANGE , FOREST DIVISION REASI UNDER UT CAPEX 2025-26 |
---|---|
Tender Description | clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of upto a distance of 50 m outside the earth work in excavation by manual means over areas (exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : all kinds of soil providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level: 1:5:10 (1 cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) providing and laying damp-proof course 50mm |
Comments | clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of upto a distance of 50 m outside the earth work in excavation by manual means over areas (exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : all kinds of soil providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level: 1:5:10 (1 cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) providing and laying damp-proof course 50mm |
Published Date | |
---|---|
Due Date | 14 Sep 2025 00:00:00 |
Estimated Value | 20.0 Lakh |
---|---|
EMD | 0 INR |
Processing Fee | 0 INR |