Details: dismounting of the old and worn-out convectors from various locations of ipd/opd block (ipd block corridor, general surgery opd, dermatology opd, general medicine opd, psychiatry opd and allied areas) and sorting the same as per the instructions of site incharge supply, installation, testing and commissioning of steel panel radiators conforming to en 442 or equivalent of different capacities complete with inlet outlet valves, air purge valves and allied accessories. the job includes providing and fitting of fixtures required for installation of the said radiators at above locations mentioned at s.no 01size of radiators: as per the site requirement heating capacity (kcal/hr) at water temperature 75/65℃ and 22℃ 1900-2000 kcal/hr 1400-1500 kcal/hr supply, installation, testing and commission of hot water circulation piping of m.s “c” class, erw conforming to is:1239 part-i, with fittings like tess, elbows, bends, junctions, unions, flanges, , clamps, ms structural support from main head
Sector: PWD