Description: Construction of slaughter House at Gundkarim Khan Watergam ward no 8 Balance work Name of Work Construction of slaughter House at Gundkarim Khan Watergam ward no 8 Balance work
Details: Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres:2.9.1 All kinds of soil : Providing and laying of stone soling hand packed dry including all carriage and cost of material involved complete. Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level 1:4:8 (1Cement: 4 coarse sand: 8 grade stone aggregate 40mm nominal size) (crushed) including all carriages and cost of material involved. Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level 1:2:4 (1Cement: 2
Sector: PWD