Details: earthwork in trench excavation by manual means in trenches for foundations, drains, pipes, cable etc. (not exceeding 1.5 in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 mtr including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in all kind of soils. providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. all work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 80% concrete and 20% boulders hand packing stone soling centering and shuttering including strutting, propping etc. and removal of form work carriage of sand bajree from 4 km by mt and 200m hl carriage of cemnt and steel from 4 km by mt and 200m hl carriage of stone by 500m hl add provision for sign board
Sector: RDPR