Details: earthwork in excavation by manual means over areas (exceeding 30 cm in depth,1.5 mtr in width as well as 10 sqm on plan)ncluding d disposal of earth, lead upto 50 m and lift upto 1.5 m in -all kinds of soil p/l of stone soling including tamping manually incl carriage lead complet/incl plums and nallah boulder (for filling) providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. all work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) providing and fixing of shuttering including removal of same supply and filling of nallah boulders/rbm/stone solling behind walls incld all carriages 12 mm thick plaster in 1:6 mix carriage of materials cement bwo trip sand /bajri 20 km by mt add provision for signboard and photograph charges/carriage of material by hl and other unforeseen items as per direction of engineer in charge sta
Sector: RDPR