Details: dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead for thickness of tiles above 25 mm and upto 40 mm. demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of engineer-in charge 1:3:6 or richer mix (i/c equivalent design mix demolishing r.c.c. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of engineer-in-charge. earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed all kind of soil 1 meter from cutting edge removal of excavated mulba dismantled unservicea
Sector: Urban Authority