Details: earth work in excavation by manual means in trenches for foundation, drains, pipes, cables etc. not exceeding 1.5 m in width as well as 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: p/laying dry stone metal centering and shuttering including strutting, propping etc. and removal of form work for: foundations, footings, bases for columns dry random rubble masonry with hard stone in foundation and plinth providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) in steps. providing and laying 60mm thick factory made cement concrete interlocking paver block of m-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid i
Sector: RDPR