Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:all kinds of soil : providing and layig of stone soling /rbm including all carriages centering and shuttering including strutting, propping etc. and removal of form work for: foundations, footings, bases for columns structural steel work in single section, fixed with or without connectingplate, including cutting, hoisting, fixing in position and applying a primingcoat of approved steel primer all complete. providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. all work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40
Sector: RDPR