Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 m² on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: p/l stone soling hand packed on level incl ramming with heavy rammers . p/l in position cement concrete of specified grade excluding the cost of shuttering and centering finishing and reinforcement all work upto plinth level m10 grade(1:3:6 ) with 20mm aggregate( dust) centring and shuttering incl strutting propping etc and removal of fom work for foundation footing bases of columns foundation and footing bases of column supply of stone boulders to be used as plumb 12mm thick cement plaster of mix 1:6(1cement:6fine sand providing and placing in position pvc pipes of 75mm dia for staggered weep holes in r wall at specified positio
Sector: RDPR