Details: earth work in excavation in foundation trenches upto 1.5 m depth i/c disposal providing/laying of dry stone soling, tightly hand packed including al carriages providing and laying cement conc. of specified grade m 7.5 (1:4:8) mix stone agg size 40mm. including all carriages /head load centring and shuttring i/l removal of f/work providing and laying of cement concrete of specified grade m10(1:3:6) mix using stone agg size 20mm. supply and filling of nallah muck / quarry muck including loading unloading and all carroages complete job carriage of material by m/t, fine agg average lead 35km carriage of material by m/t, course agg average lead 20 km add cost photo graphs & cib board
Sector: RDPR