Details: dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of engineer-in-charge: bituminous road. demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix) earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected: removal of excavated mulba, dismantled unserviceable material from the site of work by mt/animal transport or other wise including loading /unloading complete job. providing and laying in position cement concrete of specified grade including curing
Sector: Urban Authority