Details: demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix) demolishing r.c.c. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of engineer-in-charge. earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: all kinds of soil : removal of excavated mulba, dismantled unserviceable material from the site of work by mt/animal transport or other wise including loading /unloading complete job. providing and laying in position cement concrete of specified grade inc
Sector: Urban Authority