Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth for 1 meter from cutting edge and disposal of surplus excavated earth as directed: p/l dry stone aggregate p/l in position cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. random rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with providing and fixing cib of approved size as per the direction of engineer in charge including supply of materials ,carriages all complete job(painting and writing oly) carriage of material with avg l
Sector: RDPR