Details: earth work in bulk excavation by hydralic means over areas (exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : 80% a.k.soil and 20% ord. rock. earh work in excavation by manual means in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.100% in all kinds of soil. providing and lying in position dry graded crushed stone aggregates 40mm size, excluding the cost of centring and shuttering all work upto plinth level providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with 1:3:6 mix with 30% stone filling. (in stretches). cetring and shuttering including strutting, propping etc and remova
Sector: RDPR