Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:akos r.r stone masonary dry 1:6 mix carriage of sand/ agg by 40km mt 500m ht/at carriage of stones for an avg distance of 500mtr hl//at. add cost of sign board
Sector: RDPR