Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: rr stone mass laid in cement sand motor (1:6) mix using nallah stone in found & plinth. brick work with bricks in super structure with (1:6) mix. extra over super structure qty vide item no.2 rr stone mass laid dry using nallah stone in found & plinth. f/work of ordinary timber planks. reinforcement for rcc work including straightning,cutting,bending,binding & placing in position. p/laying rcc slab (1:2:4) mix 4" thick curing complete. providing & laying 50mm thick cement concrete flooring (1:2:4) mix. 20 mm thick cement plaster (1:4) mix. providing and fixing 1mm thick m.s. sheet door with frame of 40x40x6mm angle iron and 3mm m.
Sector: RDPR