Details: drsm drsm works: of drsm check dams as anti soil erosion measure incl all operations as per forest schedule (the rate includes the earth work for foundation, the cost of collection, carriage of stones to the work site, fashioning of stones to be used along the exposed faces in the construction of drsm) however 15% void shall be deducted after measurement
Sector: Water Resource Department