Details: provision for sign board (to be paid as per actual) earh work in excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.100 % qty. in a.k.s extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material all kinds of soil providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth level,including all lead and lift. providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. all work upto plinth level in 1:1.5:3 mix,including all lead and lift. steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position and
Sector: RDPR