Details: engagement of labourers for clearance of site etc. demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of engineer-in- charge:1:3:6 or richer mix (i/c equivalent design mix dismantling damged tile work in floors and roofs including stacking material within 50 meters lead.including disposal of unservicable material beyond mpl limits as per directions of engineer incharge. removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclu
Sector: Urban Authority