The Haryana Government has published a tender for "2nd time tender for Construction of Room of Dak..." on the 17 Mar 2026. This tender belongs to Community Hall Construction category. This tender is published in Bhiwani, Haryana location. The vendors interested in this tender and related Community Hall Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: all civil works Tenders | non residential buildings construction Tenders | all types of building Tenders
Related categories: Bank Building Construction Tenders | Bank Repair Tenders | Fire Station Construction Tenders |
In Bhiwani district, Haryana, a total of 628 Community Hall Construction tenders have been published, with 17 tenders released last month.
| Tender Title | 2nd time tender for Construction of Room of Dak... |
|---|---|
| Tender Description | hsr item 7.22.2-brick work with common burnt clay nonmodular bricks of class designation 10.5 in superstructureabove plinth level up to floor iv level in all shapes and sizes in: 2. cement mortar 1:6 (1 cement : 6 coarse sand)hsr rate(rs.) 4488.00 through rate hsr item 7.28.1-half brick masonry with common burnt claynon-modular bricks of class designation 10.5 in superstructureabove plinth level up to floor iv level. 1. cement mortar 1:3 (1cement :3 coarse sand)hsr rate(rs.) 519.00 through rate hsr item 6.15.1-reinforced cement concrete work in walls(any thickness), including attached pilasters, buttresses, plinthand string courses, fillets, columns, pillars, piers, abutments,posts and struts etc. above plinth level up to floor four level,excluding cost of centering, shuttering, finishing andreinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zoneiii) : 3 graded stone aggregate 20 mm nominal size)hsr rate(rs.) 5969.00 through rate hsr item 6.30.5-centering and shuttering including s |
| Comments | hsr item 7.22.2-brick work with common burnt clay nonmodular bricks of class designation 10.5 in superstructureabove plinth level up to floor iv level in all shapes and sizes in: 2. cement mortar 1:6 (1 cement : 6 coarse sand)hsr rate(rs.) 4488.00 through rate hsr item 7.28.1-half brick masonry with common burnt claynon-modular bricks of class designation 10.5 in superstructureabove plinth level up to floor iv level. 1. cement mortar 1:3 (1cement :3 coarse sand)hsr rate(rs.) 519.00 through rate hsr item 6.15.1-reinforced cement concrete work in walls(any thickness), including attached pilasters, buttresses, plinthand string courses, fillets, columns, pillars, piers, abutments,posts and struts etc. above plinth level up to floor four level,excluding cost of centering, shuttering, finishing andreinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zoneiii) : 3 graded stone aggregate 20 mm nominal size)hsr rate(rs.) 5969.00 through rate hsr item 6.30.5-centering and shuttering including s |
| Published Date | |
|---|---|
| Due Date | 24 Mar 2026 00:00:00 |
| Estimated Value | 8.47 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |