Details: hsr item 32.70.2-supply installation testing commissioning of solar photovoltaic grid connected roof top plant conforming to mnre specifications as amended, consisting of mono/poly crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on aluminium/gi structure of suitable strength with following components complete as required:-(a) solar photovoltaic module manufactured in india, conforming to is 14286/iec 61215, is/iec 61730-part-1, is/iec 61730-part-2. solar photovoltaic module conversion efficiency shall not be less than 16.5%. pv modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. (b) power conditioning unit (pcu) of 350-800 v dc input voltage range and 400 v ac, three phase, 4 wire, 50hz plus /- 2.5 hz, output voltage suitable to generate ac (c) power with efficiency not less than 97%, total harmonic dist
Sector: Urban Authority