Details: dismantling brick work tile, masonry or tile lining in cement dismantling aluminium/ gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material within 50 meters lead as directed by engineer-in-charge dismantling concrete plain 1:4:8 dismantling reinforced concrete dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. dismantling tile work/ kota/granite in floors/ cladding laid in cement mortar including stacking material within 50 metres lead. scraping white wash and colour wash removal of building with 5km from premises. removal of upto 12mm thick toughened glass and stacking the servicqable material as directed by engineer in charge. reinforced cement concrete m-30 mechanically batch mixed using batch type concrete mixer as per is:17
Sector: Sports