Details: dismetling of brick edgning csr item no.8.5 (i) dismantling of exisiting road crust taking it as solling as per csr 24.3 a excavation in soil (any type) using hydraulic excavator ck 90 excavation with hydraulic excavator of 0.9 bucket capacity including cutting trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lift and combined lead up to 60 mtr. compaction of earth work & preparation of sub grade including loosening, leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the table 300-2 as per technical clause 305 of mort&h specifications. (in case of link roads earth work to be done by villagers) construction of embankment with good quality earth obtained from borrow pits including compensation of earth, loading, unloading, carriage to site of work, spreading, grad
Sector: Road development