Details: - earthwork undressed involving an avg. horizontal throw upto 2 mtr. and an avg. vertical lift upto 0.5 mtr. including breaking of clods earthwork undressed with combined lead upto 15 mtr. including breaking of clods. dressing of earthwork (new work or remodelling work) excavation of soil using hyraulic excavator and hydraulic tractor trolly i/c cutting and loading in trolly and transporting to the embankment locations with all lifts and leads excluding royalty. earth filling with ordinary soil in 15 cm layers including, ramming, watering and consolidating lead upto 30m dag-belling with single kassi minimum 7.5 cm depth. dressing of bed and preparation of sub-grade for lining pulverized flyash-lime bricks as per class 12.5 of is: 12894-002 laid in cement sand mortar 1:6 in foundation and plinth. 10 mm thick cement plaster 1:4 on side walls 10 mm thick cement plaster 1:4 on floors supplying of rcc shutter supplying & laying dry brick bats excavation by
Sector: Water Resource Department