Details: civil work dismantling stone pitching dry construction of embankment with good quality earth obtained from borrow pits including compensation of earth, loading, unloading, carriage to site of work, spreading, grading to required and compacting to meet requirement of table 300-2 as per technical clause 305 of mort&h specifications compaction of earth work & preparation of sub grade including loosening, leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the table 300-2 as per technical clause 305 of mort&h specifications. relaying of dismantled material as gsb granular sub-base by providing material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, complete as per mort&h technical specificati
Sector: Road development