Details: supply installation & commissioning of discharge monitoring system with cable way comprising of 1a: radar type level & velocity sensor for discharge measurement note: cross section or the profile shall be provided by the customer for discharge calculation2a: mounting brackets for sensor installation 3a: data logger with 2 ai channel andcommunication port for gsm/gprs/4g 4a: gsm/gprs modem for data communication5a: suitable enclosure housing for data logger, gsm/gprs modem, solar power supply etc.6a : required cable for power and sensor interfacing 7a : solar power supply for 8 days power backup testing and commissioning 70 to 80 m long cable way across the river as per site requirement complete in all respect comprising of following component as per drawing. main columns of steel work welded in built up sections of ismc 200 mm heavy duty, 2m long having bottom plates @ 1000 mm with anchor volt 08 nos including applying a priming coat of red lead paint, co
Sector: Water Resource Department