Details: - labour rates for earthwork undressed with combined lead upto 15 mtr. including breaking of clods. dressing of new earthwork excavation of soil using hyraulic excavator and hydraulic tractor trolly i/c cutting and loading in trolly and transporting to the embankment locations with all lifts and leads for filliing. lead 3 km earth filling with ordinary soil in 15 cm layers including, ramming, watering and consolidating lead upto 30m labour rates for cement conc.1:4:8 with brick ballast labour rates for cement conc.1:2:4 including supply, carriage & with stone ballast or shingle labour rates for shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) labour rates for providing,lowering precast concrete np-2 plain end pipes and collar with reinforcement in trenches to correct gradient and alignment,cutting of reinforcement cement concrete plain end pipes,stringing in trenches,jointing ends and fixing collar with cement mortar 1:2 as per is
Sector: Water Resource Department