The MPPTCL has published a tender for "for 50MVA Transformer (Repaired Unit) against augmentation of 20MVA Transformer at 220KV Substation Damoh" on the 17 Nov 2025. This tender belongs to Electrical Substation category. This tender is published in Sagar, Madhya Pradesh location. The vendors interested in this tender and related Electrical Substation tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: power line substation Tenders | all power line work Tenders | electric power lines Tenders
Related categories: Airport Runway Repair Tenders | Road Paving Tenders | Road Relaying Tenders |
In Sagar district, Madhya Pradesh, a total of 94 Electrical Substation tenders have been published, with 8 tenders released last month.
| Tender Title | for 50MVA Transformer (Repaired Unit) against augmentation of 20MVA Transformer at 220KV Substation Damoh |
|---|---|
| Tender Description | of structures 132kv isolator without earth switch (3 phase) dismantling of 132kv isolator and shift to a safe place of 33 kv current transformer dismantling of 33 kv current transformer and shift to a safe place. of 33 kv circuit breakers (3 phase) dismantling of 33 kv vcb and shift to a safe place. of 132 kv la of 33kv isolator 3ph w/o e/s shifting & placement and complete of isolators of 33kv isolator 3ph w/o e/s dismantaling of 33kv isolator and shift to a safe place cable laying 8core x 2.5 sqmm unarm cable laying 12core x 2.5 sqmm unarm cable laying 19core x 2.5 sqmm unarm earthing installation 65*8mm ms flat earthing installation 50*6mm ms flat earthing installation rates for installation & prepartaion of earthing pits (1.5x1.5x3 mtr) as per boards drawing no xii-8.774b which includes excavation (irrespective of the soil encountered) cable termination 2 core x2.5 sqmm unarm cable termination 4 core x2.5 sqmm unarm cable termination 8 core x 2.5 sqmm unarm cable ter |
| Comments | of structures 132kv isolator without earth switch (3 phase) dismantling of 132kv isolator and shift to a safe place of 33 kv current transformer dismantling of 33 kv current transformer and shift to a safe place. of 33 kv circuit breakers (3 phase) dismantling of 33 kv vcb and shift to a safe place. of 132 kv la of 33kv isolator 3ph w/o e/s shifting & placement and complete of isolators of 33kv isolator 3ph w/o e/s dismantaling of 33kv isolator and shift to a safe place cable laying 8core x 2.5 sqmm unarm cable laying 12core x 2.5 sqmm unarm cable laying 19core x 2.5 sqmm unarm earthing installation 65*8mm ms flat earthing installation 50*6mm ms flat earthing installation rates for installation & prepartaion of earthing pits (1.5x1.5x3 mtr) as per boards drawing no xii-8.774b which includes excavation (irrespective of the soil encountered) cable termination 2 core x2.5 sqmm unarm cable termination 4 core x2.5 sqmm unarm cable termination 8 core x 2.5 sqmm unarm cable ter |
| Published Date | |
|---|---|
| Due Date | 04 Dec 2025 00:00:00 |
| Estimated Value | 0.0 |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |