The MPMKVVCL has published a tender for "Estimate for Augmantation Of 3KM 11 KV. Line Conducttor at 11 KV. Sada Feeder Under Raghoarh DC Under ONM Division Raghogarh." on the 22 Sep 2025. This tender belongs to Power Line Maintenance category. This tender is published in Guna, Madhya Pradesh location. The vendors interested in this tender and related Power Line Maintenance tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: electrical power line maintenance Tenders | electric meter boxes Tenders | all power line work Tenders
Related categories: Lighting installation services Tenders | High Mast Light Tenders | Street Light Installation Tenders |
Around 14052 tenders were floated in Madhya Pradesh in the past month with major spending on cc road Tenders, drain construction Tenders, vehicle hiring Tenders
Tender Title | Estimate for Augmantation Of 3KM 11 KV. Line Conducttor at 11 KV. Sada Feeder Under Raghoarh DC Under ONM Division Raghogarh. |
---|---|
Tender Description | provision :- schedule a- augmentation of existing 11 kv line - 3 km. wpb 160x160 mm., 30.44 kg./ mtr. h-beam 11 mtr. long wpb 160x160 mm., 30.44 kg./ mtr. h-beam 11 mtr. long -[including pit digging- base padding of pole by stone block/pre cost block, pole , back filling/boulder, earthing coil] 11kv polymer pin insulator labour charges for fixing of 11kv polymer pin insulator m.s. nut and bolts aaac raccoon conductor 0.075 sq. inch (80 sq.mm.al.eq.) stringing of aaac raccoon conductor 0.075 sq. inch (80 sq.mm.al.eq.)(including with transportation from area store guna/gwalior/ bhopal to working site) concreting of rail/hbeam supports @0.65 cmt. per pole including muffing of pole labour charges for concreting of rail/hbeam supports @0.65 cmt. per pole including muffing of pole back clamps for h-beam of ms flat 65x8mm (each weight 1.92 kg) d.c. cross arms 4 ft centre to centre (75x40x6 mm.) channel dismantaling charge for acsr scrap conductor (return to area strore guna) gst @ 18% |
Comments | provision :- schedule a- augmentation of existing 11 kv line - 3 km. wpb 160x160 mm., 30.44 kg./ mtr. h-beam 11 mtr. long wpb 160x160 mm., 30.44 kg./ mtr. h-beam 11 mtr. long -[including pit digging- base padding of pole by stone block/pre cost block, pole , back filling/boulder, earthing coil] 11kv polymer pin insulator labour charges for fixing of 11kv polymer pin insulator m.s. nut and bolts aaac raccoon conductor 0.075 sq. inch (80 sq.mm.al.eq.) stringing of aaac raccoon conductor 0.075 sq. inch (80 sq.mm.al.eq.)(including with transportation from area store guna/gwalior/ bhopal to working site) concreting of rail/hbeam supports @0.65 cmt. per pole including muffing of pole labour charges for concreting of rail/hbeam supports @0.65 cmt. per pole including muffing of pole back clamps for h-beam of ms flat 65x8mm (each weight 1.92 kg) d.c. cross arms 4 ft centre to centre (75x40x6 mm.) channel dismantaling charge for acsr scrap conductor (return to area strore guna) gst @ 18% |
Published Date | |
---|---|
Due Date | 07 Oct 2025 00:00:00 |
Estimated Value | 1.73 Lakh |
---|---|
EMD | 0 INR |
Processing Fee | 0 INR |