Details: road work maintenance work of jabalpur - hiran river section of nh-12 from existing km. 11/4 to 66/4 (design chainage 10+400 to 66+000) in the state of madhya pradesh to four lanes with paved shoulders under nhdp-iii on epc mode on the risk and cost of the epc contractor.
Sector: Road development