Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. as per morth specification sl no. 2.3 clause no. 201-a c & g construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2. carted earth 08 kmas per morth specification sl no. 3.16 clause no. 305 embankmaent construction of sub-grade and earthen shoulders with approved material cbr not less than 10 % obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required and compacted to meet requirement of table no. 300-2 cart
Sector: Industry Development