Details: excavation in trenches n. exc 1.5 m wide and n.exc 1.5 m in depth and getting out soft/loose soil complete all as specified and as directed for laying of under ground cable, foundation of pole and stay etc. complete all as specified and as directed returning, filling in, including spreading, levelling, watering and well remmining in layers not exc 25 cm.complete all as specified and as directed removing excavated material n.exc 50 m and depositing where directed at a level n. exc 1.5 m above the starting point complete all as specified and as directed m&l for sand cushioning to u/g cable in layers of 23 cm thick( 8 cm before laying the cable and 15 cm thick after laying the cable) in trenches complete all as specified and directed.note :- only puned down volume shall be measured. supply and lay burnt best quality locally available old size sub class 'b' bricks laid in trenches perpendicular to u/g cable for cable protection complete all as specified and as directed. laying only servic
Sector: Defense