Description: Construction of R C C Lined Channel Unlined Channel R C C Water Controlling Structures Works Name of Work CONSTRUCTION OF LINED UNLINED CHANNEL WATER CONTROLLING STRUCTURES AT SARYU NAHAR PARIYOJANA PHASE III IN DISTT GONDA UNIT GONDA I LOT NO 209
Details: Earth Work in construction of Gulls/ channel manually or by tractor where ever possible and applicable,including hard clay,chharri,bajri up to 5%, including all leads and lifts, excluding mechanical compaction but inclusive of manual compaction and dressing to profile and all T & P required for proper completion of work. Providing and laying LDPE 200 micron thick film(1st grade) on sub grade before construction of lining, gulls,structure etc including material,labour etc required for proper completion of work as per direction of engineer-in-charge. Providing and Laying cement concrete 1:4:8 (1 cement: 4 coarse sand FM>2.0 : 8 stone grit 40mm nominal size) in foundation with mechanical mixing including cost of all material with all leads and lifts including compaction and curing etc required for proper completion of work as per directions of engineer-in-charge. Providing and laying R.C.C. 1:2:4(M-15), (1- cement: 2- coarse sand FM>2.0: 4- 20mm nominal size aggregate) exc
Sector: Infrastructure