Details: civil work demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of engineerin-charge.. demolishing cement concrete manually/ by mechanical means including disposal of the material within 50 metres lead as per direction of engineer - in - charge.-nominal concrete 1:3:6 or richer mix (i/c equivalentdesign mix) nominal concrete 1:4:8 or leaner mix (i/c equivalentdesign mix) demolishing r.c.c. work manually/ by mechanical means includingstacking of steel bars and disposal of unserviceable material within50 metres lead as per direction of engineer - in- charge. clearing jungle including uprooting of rank vegetation, grass, brush wood,trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared. earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not excee
Sector: Smart City