Details: earth work excavation in foundation ordinary soil……..s.i.no251.(excluding royalty) cement concrete with 4 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 8:4:1 including supply of all materials, labour and t&p etc. required for proper completion of the work.(s.i.no.281) first class brick work with 1:6 cement and coarse sand in foundation plinth including supply of all material, labour t&p etc. required for the proportion of the work as per s.i. 303 cement concrete with 2 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and t&p etc. required for proper completion of the work.(s.i.no.279(i)) 12 mm thick plaster with cement and course sand of 1.25 f.m. mortar in 1:4 brick work minimum thickness not to be less than 3/8" (10 mm) thick including supply of all materials, labour and t&p etc. required for proper completion of the work. (s.i.no.584 i) earth
Sector: Urban Authority