Details: road workseath work in cutting in ordinary soil loam clay or sand 1.5mt lift and 30mt lead and surplus will be use in making embankment as per pwd sor (2023) item no. 253 earth work with machanical compaction including of levelling, dressing, watering & compacting the soil to achieve 95% proctor density etc. all complete. construction of granular sub base (g.s.b.) by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, compete at per clause 401. (analysis rate) providing laying, spreading and compacting graded stone aggregate to wet mix macadam (wmm) specification including premixing the material with water at omc in machanical mix plant carriage of mixed material to site laying in uniform layers with paver finisher in sub base/ base course on well prepared surface and compcting with vibratory roller to achieve the d
Sector: Urban Authority