Details: construction works excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 meters and lead upto 30 meters and including filling, watering and ramming of excavated earth into the trenches or into the space between the builiding and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by engineer-in-charge upto a distance of 30 meters from the foundation trenches (si. no. 251) uppwd sor-2022 concrete with 4 cm guage stone ballast, coarse sand and cement in proportion of 10:5:1 in foundation and under floors including supply of all material, labour, t&p etc. required for proper completion of the work. (si. no. 274 but in the proportion 275) 2022 r.c.c. work with cement approved coarse sand & 2 cms. guage approved crushed stone grit in proportion of 1:1.5:3 in raft foundation windows and sunshades excluding supply of reinforncement and its bending but including its fixing & binding the same with 24 bwggi bindin
Sector: Urban Authority