Details: earthwork in excavation by manual / mechanical means in roadwork, or any kind of soil etc., to the required levels and grades in both dry and wet conditions, including dressing of sides and ramming of bottoms, getting out excavated earth with lift upto 1.5 m and disposal of surplus excavated materials within tfl premises etc., complete as per direction of engineer-in-charge(e.i.c.) in all kinds of soils as defined in is: 1200 including providing temporary supports to all service lines such as overhead and underground water, sewage and drain pipes, cables etc. and shoring and strutting wherever necessary, dewatering if required etc. complete in all respects as per direction of engineer-in-charge. backfilling with available excavated good earth (excluding rocks / boulders), as approved and directed by engineer-in-charge, in trenches, plinth, under floors, sides of foundation etc., at all depths in layers not exceeding 20 cms. in thickness
Sector: Industries and Factories