Details: civil work scraping of old 5 cm painted surface including disposal of all scraped material to a distance of 30 m as per direction of e/i. providing,laying,spreading and compacting stone aggregates of specific sizes (22.4-53 mm) to water bound macadam specification including spreading in uniform thickness,hand packing,rolling with smooth wheei roller 80-100 kn in stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate,watering and compacting to the required density. wbm grading-iii as per technical spcification clause 405. providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including cleaning of road surface and spraying primer @ 0.60 kg/sqm providing and applying tack coat with bitumen (vg-10) using bitumen emulsion pressure distributor @ 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with mechanical broom
Sector: Industry Development