Details: dismantling sundries brick work including stacking of dismantled materials as directed by the engineer-in-charge within a distance of 60 metre (200 feet). [ s.i. no. – 691]2022 excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m and lead upto 30 m and including watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenche or into the plinth and removal and disposal of surplus as direction by e/i up to a distance of 30 m from the foundation trenches. [s.i. no.-251(a)]-2022 cement concrete with 4 cm gauge approved stone ballast, coarse sand and cement in the proportion 8: 4: 1 in foundation and undred floors, including supply of all material, labour and t & p etc. required for proper completion of the work. [s.i. no. -251(a)]-2022 r.c.c. work with cement approved coarse sand and 2 cm.(3/4") gauge approved stone ballast in the proportions of 1:1.5:3 in r.c.c. footing excluding supp