Details: painting providng and making wall painting work on boundary wall with base including material & labour t&p etc complete with all respect indirection of enginner in-charge/ heier office. enclusive all taxes.32.92 x 2.44 = 80.32 34.14 x 2.44 = 83.3016.76 x 2.13 = 35.7013.71 x 2.13 = 29.2036.57 x 2.13 = 77.8933.53 x 2.13 = 71.4227.43 x 1.52 = 41.6924.38 x 1.83 = 44.6215.24 x 1.52 = 23.1618.29 x 1.52 = 27.8016.76 x 1.52 = 25.48collectrate boundry wall95.00 x 1.70 = 161.5030.00 x 1.40 = 42.0057.00 x 1.60 = 91.2075.00 x 1.70 = 127.5055.00 x 1.65 = 90.75
Sector: Urban Authority