Details: excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m and lead upto 30 m and including watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by e/i upto a distance of 30 m from the foundation trenches. [s.i. no. - 251 (a)]/2022 cement concrete with 40 mm gauge stone ballast, fine sand and cement in the proportion 8: 4: 1 including supply of all material, labour and t & p etc. required for proper completion of the work. [s.i. no. - 281 ] sor-2022 chequerred precast cement concrete tiles 22 mm thick in footpath &courtyard, jointed with neat cement slurry mixed with pigment to matchthe shade of tiles, including rubbing and cleaning etc. complete, on 20mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand) light shade pigment using white cement [dsr- 11.20.1/2023] cement concrete wi
Sector: Urban Authority